Extensive 9-million-dollar renovation, which included a little bit of everything. The bulk of the project was a complete replacement of the glass guard systems from the basement to the third floor. Using a base shoe railing system and 21mm low-Iron tempered glass we enclosed the existing stair layout with a contemporary design. Project also included the replacement of the front entrance, custom glass drink shelves, security film, bathroom mirrors and miscellaneous interior glazing
Commercial